Sunday, September 20, 2009
Sunday, September 13, 2009
Plumbing, Framing & the Bodega
one of our favorite restaurants on the beach,
where the management doesn't mind if we park inside!
Saturday, September 5, 2009
Back to Work
Sorry I haven't posted a lot lately, Janell & my son came
down here for 3 weeks so we did some traveling around
the country & I left the home on hold for a little while.
Story & pics from our vacation will be posted at
http://shorty-shortyjanelleincostarica.blogspot.com/
For now back to work, & this week we've done a lot.
Once the Kasha Posts were selected for placement,
(theres always a comedian!)
then the framing could begin.



Wow, the house is now really starting to take shape!
In the bathrooms the showers were started also!
down here for 3 weeks so we did some traveling around
the country & I left the home on hold for a little while.
Story & pics from our vacation will be posted at
http://shorty-shortyjanelleincostarica.blogspot.com/
For now back to work, & this week we've done a lot.
Sunday, August 2, 2009
The Pumphouse & some gardening
This week we started with building a "Bodega" or shed to keep
some tools & fuel in, also to house the water pump and generator.
On top it will hold the water storage tank.
We then ordered a few loads of gravel & had the backhoe spread
it around the house and the driveway to fill in some low spots.
After that we put our new truck to work
and took some plants from Caribe Town
out to the property
where we did some gardening.

Sunday, July 12, 2009
Away on Vacation!
Well I've been in America for the past month so not a lot of progress.
Did manage to get the slab poured over the well, walls soon!
While I was away the support posts were sanded &
treated and some of the framing wood was delivered.
These next pictures are of my next door neighbors
houses, also in various stages of completion.


treated and some of the framing wood was delivered.
houses, also in various stages of completion.
Sunday, May 31, 2009
The floor pour
First they drive little posts in the ground and level them with a string.
The string is then removed and the reinforcement
mat is installed and tied together.
After that little berms are made the height of the little wooden posts.
Then finally one by one the wheelbarrow loads of cement are leveled
off to the height of the berms until the entire floor is completed.
Sunday, May 24, 2009
Plumbing & Stucco
next week.