Sunday, September 20, 2009

Construction @ Light Speed




And the house got a ROOF!!!

The TukTuk got a smile!
Boi-Boi got a sign by the beach,

Sunday, September 13, 2009

Plumbing, Framing & the Bodega

Then Saturday after work we ate at "Boi-Bois",
one of our favorite restaurants on the beach,
where the management doesn't mind if we park inside!
The bodega got a door & locks.
More plumbing & electrical piping was done.
The kitchen counter was started.
Most of the framing got completed.

The week started something like this.

Saturday, September 5, 2009

Back to Work

Sorry I haven't posted a lot lately, Janell & my son came
down here for 3 weeks so we did some traveling around
the country & I left the home on hold for a little while.
Story & pics from our vacation will be posted at
http://shorty-shortyjanelleincostarica.blogspot.com/
For now back to work, & this week we've done a lot.
Once the Kasha Posts were selected for placement,(theres always a comedian!)then the framing could begin.



Wow, the house is now really starting to take shape!
In the bathrooms the showers were started also!

Sunday, August 2, 2009

The Pumphouse & some gardening

This week we started with building a "Bodega" or shed to keep
some tools & fuel in, also to house the water pump and generator.
On top it will hold the water storage tank.
We then ordered a few loads of gravel & had the backhoe spread
it around the house and the driveway to fill in some low spots.
After that we put our new truck to work
and took some plants from Caribe Town
out to the property where we did some gardening.

Sunday, July 12, 2009

Away on Vacation!

Well I've been in America for the past month so not a lot of progress.
Did manage to get the slab poured over the well, walls soon!
While I was away the support posts were sanded &
treated and some of the framing wood was delivered.
These next pictures are of my next door neighbors
houses, also in various stages of completion.

Sunday, May 31, 2009

The floor pour

First they drive little posts in the ground and level them with a string.
The string is then removed and the reinforcement
mat is installed and tied together.
After that little berms are made the height of the little wooden posts.
Then finally one by one the wheelbarrow loads of cement are leveled
off to the height of the berms until the entire floor is completed.

Sunday, May 24, 2009

Plumbing & Stucco

This week was focused on covering the brickwork
with stucco for a nice square finish on the walls.
Plus we installed all the plumbing in the floors
to make ready for the pouring of the slab

next week.Both baths & the Kitchen were convienently located on one side of thehouse for ease in plumbing. Here it all is on the completed back wall.