Saturday, May 2, 2009

Crown,Floor & Septic All Begin

It was a pretty exciting week in allthe framing for the crown was done on the South East side
The Floor was then leveled

a little more material addedand then digging the hole for the septic system began
Dont tell OSHA we didn't have our steel-toe boots or safety hats!

No comments:

Post a Comment